Evolt Care|Commercial AC maintenance

Evolt Care Commercial Air-Conditioning Maintenance Plans

Evolt Care is a maintenance service designed around the equipment type, quantity, contract term, operating pattern and site requirements. Each proposal states the planned visit schedule, emergency call allowance, included quantities for applicable work such as filter cleaning, condensate drain service, air-conditioning cleaning, lubrication and bearing replacement, plus any optional specified component cleaning.

  • Annual or multi-year arrangements
  • Service allowances stated in writing
  • Adjusted for the equipment and site

Every Evolt Care plan starts
with your equipment and requirements

The site is not forced into a preset package. Evolt Cool Engineering reviews the equipment type and quantity, operating hours, access constraints, known issues and your requirements, then sets these out in a written maintenance proposal.

01

Contract term

State the selected term, start date, renewal arrangement and the services that apply in each contract year.

02

Planned visits

Set the visit quantity and available work period around the equipment, operating hours and site conditions instead of applying one interval everywhere.

03

Emergency call allowance

State the included quantity, covered sites and hours, counting rule and how calls beyond the allowance are handled.

04

Selected service allowances

List applicable quantities for filter cleaning, drain service, air-conditioning cleaning, lubrication or bearing replacement.

05

Specified component cleaning scope

Set a defined number of specified-component cleaning visits by equipment type, with cleanable components, protection, isolation and access requirements.

06

Additional-work approval

Confirm the scope, price and timing of parts, work beyond the allowance, repairs or new equipment before written approval.

Put the work that is relevant to the equipment into the plan

The following items can be included where they apply to the equipment and your requirements. The proposal states the quantity, covered assets, parts or materials, labour and access conditions rather than relying on a broad “all-inclusive” label.

F01

Filter cleaning

Remove, clean and refit filters within the safely accessible scope for the equipment. Replacement filters are identified separately where needed.

D01

Condensate drain clearing

Address a blocked or slow condensate drain where applicable. Damaged pipework, incorrect falls or connection problems are reported separately.

C01

Air-conditioning cleaning

Clean the confirmed accessible components for the equipment and site need. Where specified component cleaning is selected, the components, protection, isolation and wash-water handling are stated separately.

L01

Lubrication of serviceable parts

Apply grease to components designed and intended to be lubricated. Sealed bearings and parts where lubrication is not applicable are not forced into the scope.

B01

Bearing replacement

Include an agreed quantity for eligible equipment, with the bearing specification, dismantling, labour and related component condition stated in the scope.

M01

Planned checks and basic servicing

Record basic operation, accessible observations, unusual noise or vibration and the applicable maintenance work completed during the visit.

Applicability is checked asset by asset: equipment does not share the same filters, drain arrangement, serviceable bearings or dismantling method. The written proposal separates the applicable work and items that need a separate quotation.

The same maintenance item involves different work
on different equipment

Equipment type affects more than price. It changes the accessible components, isolation method, drain arrangement, working height, tools and available work period.

Wall-mounted, cassette and ceiling indoor units
Indoor units

Splits, cassettes and ceiling units

Define the filters, drain pan, drain line, fan, motor and accessible components for the actual unit form, together with any high-level work or ceiling access.

VRV or VRF system connecting outdoor units, an indoor unit and a controller
Multi-split systems

VRV and VRF

In addition to the indoor-unit form, organise the system zones, controllers, equipment location, shutdown sequence and phased-work requirements.

FCU and AHU components including filters, coils, fans and drain trays
Air-side equipment

FCU, AHU and PAU

Confirm the filters, fan, bearings, drain, coil and plant-room access separately. Water-side, controls and other specialist interfaces remain defined scopes.

Outdoor and condensing equipment with heat-rejection clearance and working space
Outdoor equipment

Outdoor and condensing units

Plan around the location, heat-rejection environment, fan, unusual noise, access and safe working conditions. Parts and refrigerant work are assessed and quoted separately where required.

Define where one call begins and what it covers

Evolt Care can allocate a number of emergency calls according to the equipment quantity, site operation and your requirements. Call-out, attendance, inspection, repair labour, parts and completed rectification are different stages and are set out separately.

The written proposal states

  • Included quantityCounted over the full term or within each contract year.
  • How one call is countedFrom the service request, attendance booking or another agreed service point.
  • Covered hours and sitesState the available service period, covered sites, included work and how requests beyond the allowance are handled.
  • Where the included scope endsSeparate call-out, inspection, basic action, repair labour, parts and other work.
  • Excess calls and repairsConfirm the scope, price and timing before approval by the nominated contact.

Specified component cleaning can be added to Evolt Care
under a defined scope

Where the equipment and site need a more extensive clean, a stated quantity can be added by equipment type. The cleanable components, isolation, protection, access, wash-water arrangements and handover still need to be confirmed.

A technician removing the filter and checking the drain area of a ceiling cassette air-conditioning unit
Routine maintenance

Maintain the agreed inspection and minor-service rhythm

Complete applicable filter, drain, operating-observation and other stated items, then record findings and open matters.

A technician cleaning a ceiling cassette coil with a waterproof wash cover collecting the wash water
Specified component cleaning

Set a cleaning scope for identified equipment

State the equipment type, quantity, components, protection and water handling. Specified component cleaning is scoped separately from planned maintenance.

Explore commercial AC cleaning →

Six types of information help shape the right plan

  • Premises and locationsOne site or several shops, offices, centres, schools, clinics, industrial premises or warehouses.
  • Equipment types and approximate quantitiesFor example, splits, cassettes, VRV or VRF, FCUs, AHUs or other equipment.
  • Preferred contract termShare the current contract end date, preferred start timing and whether an annual or multi-year arrangement is being considered.
  • Maintenance and emergency-call needsCurrent quantities, earlier usage or the service items that should receive priority.
  • Whether specified component cleaning is neededProvide the equipment type, quantity, date of the last specified-component cleaning and any access or water-handling constraints.
  • Operating and access constraintsBusiness hours, shutdown limits, non-office-hours requests, building access and known issues.

Evolt Care FAQ

Is Evolt Care one fixed package?

No. The plan is configured around the equipment, quantities, term, operating hours, site constraints and your requirements. The written proposal states the quantity and scope of each service item.

How is an emergency call counted?

The proposal states the counting point, included quantity, covered hours and sites, and whether attendance, inspection, labour, parts or repair are included. A response or completion time is not guaranteed unless it is written into the agreed plan.

Do drain clearing, lubrication and bearing replacement apply to every unit?

No. Applicability depends on the equipment design, accessible components, part specification, safe access and dismantling requirements. Only confirmed items are included.

Is specified component cleaning included with routine maintenance?

Specified component cleaning can be selected within Evolt Care, but the equipment type, quantity, cleanable components and site arrangements are stated separately. Other cleaning needs can be reviewed under commercial AC cleaning.

What happens if a fault or another failed part is found?

The completed work, site observations and matters that still need a decision are kept separate. Diagnosis, repair or parts that require separate work are scoped and priced before approval. If the equipment has already failed, see commercial AC repair.

Can equipment or service items be added during the term?

A change can be requested. The programme and price effect of new equipment, locations, allowances or available work period is confirmed before the plan is updated in writing.

Can one plan cover several locations?

Start with the equipment, quantity, contacts and constraints for each location, then decide whether allowances are assigned by site or across the arrangement. For central schedules and cross-site records, explore multi-site maintenance.

Begin with the equipment type, quantity and preferred term

Tell us about the premises, equipment, current maintenance arrangement, selected service needs and any specified component cleaning. We will organise the applicable items and confirm the information needed for the next step.

Scroll to Top